Manor Park Multi-Use Area Concept Design
Introduction
Why this space, why now?
After more than 25 years of use, the old tennis courts in Manor Park had simply reached the end of their life. Cracked surfaces, worn fencing, and limited functionality meant the space no longer met the needs of today’s diverse community.
The challenge:
How do we take a tired space and make it truly work for everyone – regardless of age, ability, or background?
The opportunity:
Together, we can reimagine this area as a vibrant, inclusive hub for movement, play, and connection – shaped by the people who use it. Whether it’s basketball, outdoor fitness, or simply somewhere safe and social, this project is about listening to what matters most to you.
Over the past two years we’ve been listening and learning from national campaigns, experts, local partners, designers, and residents to make sure the final space reflects the creativity and energy of Glossop. This additional consultation is a key part of that process.
Let’s shape a space where everyone can move more – and feel good doing it.
Why We’re Doing This
This project delivers on local strategies to make parks safer, more inclusive, and better used by everyone – not just sporty types.
We’re transforming an underused tennis court into a vibrant, welcoming space for all ages and abilities.
Who It’s For
Especially designed for people who feel left out of traditional sports – including girls, older adults, disabled people, and those who are currently inactive.
It’s not just for sport – it’s for play, movement, socialising, and wellbeing.
Why It Matters
This isn’t about removing activity – it’s about multiplying it.
We’re creating a space that works for more people, more often, in more ways.
The Concept Design
This design is for the tennis court area only. Although not shown in the pictures, the crazy golf and miniature railway are staying.
Frequently Asked Questions (FAQs)
1. Why are the tennis courts being removed?
The existing courts are over 25 years old and in poor condition. Usage data and community feedback show that they serve a small, already active group. The new design aims to open the space up to a much wider audience – including those who are currently inactive or excluded from traditional sports.
2. Who is this new space for?
Everyone — but especially:
- People who are currently inactive
- Girls and young women (inspired by Make Space for Girls)
- Older adults
- People with disabilities
- Families and social groups
The design includes features for movement, play, fitness, and socialising – not just sport.
3. How does this align with local strategies?
The project directly supports:
- Move More High Peak Strategy – by creating inclusive, accessible spaces that encourage everyday movement.
- High Peak Parks Strategy – by enhancing safety, visibility, and community ownership of public spaces.
4. Why not just refurbish the tennis courts?
A simple refurbishment would have limited impact. By reimagining the space, we can:
- Reach more people
- Support mental and physical wellbeing
- Create a safer, more welcoming environment
- Attract more funding (we’ve already tripled the original budget)
5. Will there still be space for sport?
Yes. The design includes a Multi-Use Games Area (MUGA) , as well as open zones that can be used for informal games, fitness, and play.
6. How was the community involved?
We’ve engaged with residents, partners, and national campaigns over two years. Their feedback shaped the design — especially the need for:
- Open, visible spaces
- Social seating
- Non-prescriptive activity zones
We’re now entering a new phase of community consultation to refine the final design.
7. What’s different about how this project was delivered?
We challenged traditional procurement methods to allow for collaboration after the tender. Instead of appointing a contractor to deliver a fixed design, we’ve brought them in as a partner to co-develop the next phase with us and the community.
8. What if people still want to play tennis?
We recognise that some residents value tennis. We’re exploring options in conjunction with the Lawn Tennis Association and Glossop Tennis Club for alternative provision.
9. When will the new space be ready?
- Summer 2025: Community consultation
- Autumn 2025: Final design confirmed
- Spring 2026: Construction complete
Consultation Questionnaire
Thank you to everyone who has shared their views and ideas with us. The survey for Manor Park is now closed.
Your feedback is helping to shape the future design of the park, ensuring it reflects the needs and priorities of the community. We’ll be sharing updates on the next steps soon.